When installing photovoltaic, the most fear is rain. When it rains, the installed photovoltaic power generation system will not only have no power generation capacity, but also worry about whether bad weather will bring serious destructive consequences. During the installation of PV, I was afraid of rain, which was very annoying. I believe many PV people are very worried about the Meiyu weather in Guangdong, which greatly affected the construction progress. Now, the Meiyu weather in Guangdong has just passed, and then the typhoon Siam bah is rampant. It rained incessantly. The workers of our PV engineering team also stopped construction, and there was no way to carry out normal construction.
As there are many typhoons in Guangdong, the 338kw industrial and commercial rooftop photovoltaic power stations we are currently installing are all 450W solar panels produced by Yiming Global, which are installed on a concrete foundation with two photovoltaic modules laid flat. In this way, the height of the slope will not be too high, and will not exceed the height of the wall. The wind resistance is strong, and the typhoon with a return period of 50 years can be ensured.
A good power station needs the following:
1. Use high-quality equipment
2. Reliable design based on combination of application scenarios
3. High quality construction
Only by doing the above three points well can the photovoltaic power station operate stably for 25 years.
Tags: photovoltaic module solar panel photovoltaic energy storage system
Contact:Miss Xie
Phone:+8615107951940
Email:771783563@qq.com
Company:Guangdong Yiming Global Green Energy Technology Co., Ltd.
Add:Room 1502, Easy Commercial Center, 253-261 Hennessy Road, Wan Chai, Hong Kong